The following is a list of highway work that may affect traffic in Warren County during the coming weeks. Scheduled work is subject to change due to inclement weather and material supplies. Motorists are advised to watch for slow-moving tractors during mowing operations. When traveling through a work zone, be alert to periodic changes in traffic patterns and lane closures.
*NEW* or *UPDATE* indicates a new or revised entry since last week’s report.
INTERSTATE 66
Exit 1A, westbound – Overnight closures of ramp to I-81 southbound for bridge widening, 8 p.m. to 7 a.m. nights through December 1. Dates are approximate. Follow the posted detour. Law enforcement will assist with traffic control.
*NEW* Mile Marker 5 to 9, eastbound and westbound – Right shoulder closures, including along Exit 6 off-ramps for sign work, 8 a.m. to 5 p.m. November 27 – December 1.
INTERSTATE 81
Mile marker 299 to 300, northbound and southbound – Overnight lane closures and traffic-lane shifts as needed, 8 p.m. to 7 a.m. through March 2024. Shoulder closures 24/7. Work zone speed limit: 55 miles an hour. Work is related to southbound acceleration ramp extension and bridge widening, with estimated completion in fall 2024.
Mile marker 300 to 299, southbound – Overnight slow-rolls to shift traffic onto the new portion of the bridge, reset concrete barriers and pavement marking operations, 11 p.m. to 5 a.m. nights through December 1. Law enforcement will assist with traffic control.
PRIMARY ROADS
*NEW* Route 55 (Strasburg Road) – Flagger traffic control between Route 616 (Messick Road/Richardson Road) and Shenandoah County line for inspection of bridge over Norfolk Southern Railway, 8:30 a.m. to 4:30 p.m. November 21.
*NEW* Route 522 (Winchester Road/North Shenandoah Avenue) – Northbound and southbound single lane closures between Route 637 (Guard Hill Road/Riverton Road) and Front Royal town limits for inspection of bridge over Norfolk Southern Railway, 8:30 a.m. to 4:30 p.m. November 20.
SECONDARY ROADS
*NEW* Route 675 (Success Road) – Shoulder closures between Route 340 (Winchester Road) and cul-de-sac for rock and soil testing, 9:30 a.m. to 3:30 p.m. November 20 – November 24.
Vegetation management may take place district-wide on various routes. Motorists are reminded to use extreme caution when traveling through work zones.
Traffic alerts and traveler information can be obtained by dialing 511. Traffic alerts and traveler information also are available at www.511Virginia.org.