Connect with us

Punditry & Prose

Commentary: We Suspected Data Centers Were Creating an Energy Crisis for Virginia. Now It’s Official

Published

on

It is a truth universally acknowledged: a politician in possession of elected office must be in want of large economic development projects.

Such is the power of this compulsion that it is proof against all reason. Certainly, it has been proof against everything critics of the data center buildout have said so far: that Virginia is catapulting itself into a costly energy crisis that will raise utility bills for residents; that the public shows no love for this industry; and that the benefits to be gained (mostly in the form of construction jobs) will continue only as long as new projects follow one another in perpetuity until the landscape is consumed by concrete and transmission wires.

To the credit of the Joint Legislative Audit and Review Commission (JLARC), however, it has tried to sound the alarm. JLARC’s report, “Data Centers in Virginia,” released December 9, describes the challenges facing the state as a result of the massive, ongoing buildout of this resource-intensive industry. Many of JLARC’s conclusions seem way too sanguine to me, especially around risks to regional water supplies and air pollution from diesel generators, and the policy options it offers don’t always hit the mark.

But on the threat to Virginia’s energy supply, JLARC is blunt: Building enough infrastructure to provide electricity for even just half the data centers projected for development across the state will be difficult, requiring far more generating facilities than are under development today.

As for the current policy of allowing completely unconstrained data center growth – indeed, subsidizing it as we do now with tax exemptions to the tune of nearly a billion dollars per year – JLARC notes we are headed for a tripling of the state’s electricity usage over just the next decade and a half.  Meeting that much demand, says the report, would be “very difficult to achieve,” even if the state jettisoned the carbon emission limits imposed by the Virginia Clean Economy Act (VCEA).

Now what the heck do we do about data centers?

For those of you unfamiliar with the vocabulary of bureaucrats, “very difficult to achieve” is a term of art that translates roughly as, “This is nuts.”

It might have been better if JLARC had employed the vernacular, because as it is, Virginia’s elected leaders will probably take “very difficult” to be a sort of heroic challenge, like beating the Russians to the moon, when what JLARC means is more like achieving lasting peace in the Middle East.

One problem is cost. The law of supply and demand dictates that a massive increase in energy demand that isn’t matched by an equally massive increase in energy supply will lead to higher prices for all customers. Yet new energy projects cost money, and under traditional ratemaking principles that also means higher rates for everyone. The result is that it will be impossible to protect residents from higher utility bills, unless changes are made to the way costs get allocated.

(Figuring out how to protect residents and other non-data center customers is currently a focus of the State Corporation Commission, which held a technical conference on data centers on December 16th. Judging by what the experts it convened had to say, the SCC has its work cut out for it.)

Even if ordinary residents could be protected, the bigger problem is that increasing the supply of energy to keep up with soaring data center demand will not be easy, fast or cheap. JLARC warns that providing enough low-cost energy requires that gas plants, solar facilities, battery projects and transmission lines all be built at a pace Virginia has never achieved before, along with onshore wind farms that have never found takers here (though that may be changing), offshore wind projects that currently lack a pathway to development, and starting ten years from now, new nuclear plants in the form of small modular reactors (SMRs) that haven’t yet achieved commercial viability.

Data centers and Virginia’s special kind of denialism

Moreover, the new generation and transmission will have to overcome local opposition. On the gas side, Dominion Energy’s plans for a new plant in Chesterfield County face fierce resistance from the local community, which argues it has been burdened by fossil fuel pollution for too many years already.

Clean energy also struggles at the local level. Industry representatives told members of the Commission on Electric Utility Regulation (CEUR) on December 17 that more than 30 localities have effectively banned utility solar projects within their borders. Legislators are loath to override local government authority over permitting, even when counties that welcome data centers turn down the solar facilities needed to power them.

And of course, these generation projects involve willing landowners. When it comes to transmission lines that are forced on property owners through eminent domain – many of which will be needed only to carry power to data centers – the public backlash may be brutal.

Given so much local resistance to new generation and transmission, the fact that so many legislators nonetheless remain wedded to the data center buildout testifies to the ability of the human mind to compartmentalize.

For legislators who care about climate, JLARC has more bad news: Fully half the new data center growth coming to Virginia is slated to occur in the territories of rural electric cooperatives, which are largely unaffected by VCEA limits. In addition, very large customers of Dominion and APCo have their own VCEA loophole: if they meet certain requirements, they can leave their utility to buy power from competitive service providers. Thus, if Virginia is serious about decarbonization, it will have to tighten, not loosen, the VCEA.

The report comes with some caveats. JLARC used a team of consultants to model approaches to meeting the supply gaps, and a lot of assumptions go into the consultant’s report without a lot of details. The consultant group says it chose its mix of resources with a view to least cost, but it acknowledges that different assumptions would change the results. It may not have accounted for the fact that renewable energy and storage prices continue to drop; meanwhile, fossil gas prices are so volatile that the one certain  thing you can say about any price forecast is that it will be wrong. Moreover, it appears the effects of re-entering the Regional Greenhouse Gas Initiative were not modeled; nor were the social costs of carbon, both of which favor zero-emission sources over fossil fuel plants.

Where there are details, some beg to be questioned. Both the consultants and JLARC take for granted that a shortage of generation in Virginia can be made up by importing electricity from other states. An easy way out, sure, but it works only if other states are producing a surplus. Unless tech companies are required to secure their own carbon-free energy supply, there is no way to guarantee imports will be available. Contrary to one of JLARC’s suggestions, then, retail choice should not be curtailed. The better move is to expand shopping options for large customers, so long as the electricity they buy is zero-carbon.

Even more suspect is the idea that, in order to comply with the VCEA, all gas plants will convert to burning green hydrogen in 2045. The report might as well say, “and then a miracle occurs.” A miracle would be more likely.

However unserious, hydrogen as a placeholder for any hoped-for technology that isn’t available today demonstrates the fundamental problem confronting Virginia’s damn-the-torpedoes approach to data centers. A refusal to put constraints on the buildout means taking a leap into the unknown and hoping something will happen to save us from the consequences of our profligacy.

And sure, maybe it will work out. Legislators tend to be optimists, and they are already betting on bright, shiny objects like SMRs, fusion, and anything else not close enough for its costs and drawbacks to be fully evident. (Not that I’m immune, but personally I’m betting on advanced geothermal, which is not just bright and shiny but already here.) And hey, for all we know, artificial intelligence, the technology most culpable for today’s energy crisis, might even produce some unexpected new energy source.

Or it might not. Given that most of the data center buildout will happen in just the next five years, we might need an actual miracle.

On the flip side, maybe new technology will reduce the energy demand of data centers by orders of magnitude. That would be a fantastic outcome from the standpoint of climate, water and energy — though it would end the construction gravy train in Virginia and leave a wasteland of empty concrete warehouses and stranded energy infrastructure.

Either way, the unconstrained buildout of data centers has handed Virginia leaders a problem that is, in the parlance of JLARC, “very difficult” indeed.

by Ivy Main, Virginia Mercury


Virginia Mercury is part of States Newsroom, a nonprofit news network supported by grants and a coalition of donors as a 501c(3) public charity. Virginia Mercury maintains editorial independence. Contact Editor Samantha Willis for questions: info@virginiamercury.com.

Front Royal, VA
66°
Cloudy
6:07 am8:30 pm EDT
Feels like: 66°F
Wind: 3mph SSW
Humidity: 89%
Pressure: 30.1"Hg
UV index: 0
SunMonTue
86°F / 66°F
88°F / 68°F
84°F / 68°F
Opinion10 hours ago

In Enthusiastic Agreement with Supervisor Jamieson

National News10 hours ago

States Move to Limit Classroom Screen Time

State News15 hours ago

Even Without a New Map, Buttigieg Says Virginia Dems Can Win With Focus on Healthcare, Affordability

State News15 hours ago

Virginia Hospitals Predict $31B Reduction in State’s Medicaid Funding If Proposed CMS Rule Passes 

Business Growth Series18 hours ago

Business Growth Series: Trying to Do Everything Yourself Is Limiting Your Growth

Travel21 hours ago

Agritourism Offers a Fresh Way to Enjoy Summer Close to Home

State News1 day ago

Congressional Report Says Virginians Have Paid $1.8 Billion More for Gas Since Iran War Started

State News1 day ago

UVA Study Shows How Housing Affordability Policy, Civic Engagement and Voter Turnout Connect

Historically Speaking1 day ago

More Than a Futbol Rivalry

Scott's Turn1 day ago

Scott’s Turn: A Conversation About Building Stronger Communities

Common Ground with Coolidge1 day ago

The Power of Words: A Lesson From Calvin Coolidge

Community Events1 day ago

Excel to Perform July 23 at Gazebo Gatherings

Obituaries1 day ago

Michael Ray Santmyers (1971 -2026)

Health2 days ago

Oatmeal: Why Some Swear by It and Some Swear at It

Community Events2 days ago

This Week’s Showtimes at Royal Cinemas as of July 24th

Obituaries2 days ago

Marcelene Fay “Marci” Pinion (1958 – 2026)

Obituaries2 days ago

Buford “Bo” Lynn Kibler (1942 – 2026)

Opinion2 days ago

A Path to Fiscal Responsibility and Public Wellness

Local Government2 days ago

Moving Data Center Regulations and Permitting Forward a Dominant Topic of Conversation for County’s Elected Officials

Home3 days ago

Screen Rules That Actually Work

Local News3 days ago

Blue Ridge Wildlife Center Patient of the Week: American Barn Owl

State News4 days ago

After Taking Off in Charlottesville, Feds Plan National Electric Aircraft Charging Network Rollout

Arrest Logs4 days ago

POLICE: 7 Day FRPD Arrest Report 7/20/2026

National News4 days ago

FDA: Taylor Farms iceberg lettuce sample produced a false positive for cyclospora

State News4 days ago

Data Centers Want to Build Their Own Gas Turbines. Would That Skirt State Renewable Energy Laws?