Connect with us

Local News

Virginia’s Route 658 to Get Bridge Over Norfolk Southern Railway Becoming a Reality

Published

on

Warren County to Benefit from Improved Traffic Flow and Future Rail Needs Accommodation

In a push to improve traffic flow reliability and accommodate future rail needs, the Virginia Department of Transportation (VDOT) has announced a new bridge construction project on Route 658 (Rockland Road) over the Norfolk Southern Railway in Warren County.

This is a video released by VDOT in 2021 as an overview of the project.

This project will develop a grade-separated crossing over the Norfolk Southern Railway, strategically situated near Front Royal and the Virginia Inland Port. The endeavor is driven by the need to mitigate frequent and lengthy traffic disruptions experienced by motorists due to trains accessing this track multiple times a day.

The bridge, standing 220 feet long and 42 feet wide, will boast a minimum vertical clearance of 23 feet over the railroad tracks. Its height is designed to accommodate double-stacked freight containers, allowing uninterrupted passage of trains beneath the bridge and ensuring traffic on Route 658 continues unimpeded.

The Route 658 project will also incorporate enhancements to the roadway approaches. In addition, it aims to improve the alignment of Route 705 (Fishnet Boulevard) with the entrance to Rockland Park. The shift of Route 705 and the park’s entrance away from the railroad tracks will facilitate the construction of a right-turn lane into the park, aligning it with a new entrance road for Cornerstone Baptist Church.

Another notable feature of the project includes the installation of a new access road to the natural gas facility and a realigned service road for Alleghany Power. Route 658 will also boast paved shoulders wide enough for both bicyclists and pedestrians, including the stretch over the railway.

Crucially, the project design takes into consideration environmental factors, ensuring the preservation of sinkhole areas which serve as the habitat for the protected Madison Cave Isopod species.

Construction is set to kick off in early 2024, with the project advertised for construction in summer 2023. The construction phase is projected to span 19 months, with Route 658 closed for the duration and traffic rerouted. However, Rockland Park will remain accessible to the public throughout the construction period.

As of 2021, Route 658 experienced an average daily traffic count of 2,600 vehicles, a figure expected to swell to 6,400 vehicles per day by the design year of 2046. The project, with a total estimated cost of $28,096,042, is partially funded by a BUILD grant awarded to the Virginia Port Authority by the United States Department of Transportation.

This significant infrastructure improvement will not only eliminate waiting times for the thousands of vehicles that use Rockland Road each day but will also future-proof the route to meet anticipated railway expansion needs.

VDOT held a virtual public meeting last year – click here to watch the recording.

 

Front Royal, VA
63°
Cloudy
7:11 am6:51 pm EDT
Feels like: 63°F
Wind: 0mph W
Humidity: 95%
Pressure: 30.1"Hg
UV index: 0
MonTueWed
72°F / 41°F
66°F / 43°F
75°F / 52°F
Meet the Candidates6 hours ago

Mayor Lori Athey Cockrell Looks to Water, Economic Development and Rail Trail in Another Term

Livestream - WCHS14 hours ago

WCHS vs. Brentsville HS – Girls Volleyball – October 6, 2026

Health15 hours ago

BMI Is Only One Piece of the Health Picture

Interesting Things to Know1 day ago

The Eye Surgery Factory That Could Not Expand

Historically Speaking1 day ago

Ancient Ownership of Israel

Local News1 day ago

VDOT: Warren County Traffic Alert for October 5 – 9, 2026

Local News2 days ago

Reaching Out Now Expands Programs and Opportunities for Warren County Youth

Local News2 days ago

Dance and Arts VA Finds New Home, New Opportunities on Water Street

Obituaries2 days ago

Ann L. Shuman (1933 – 2026)

Obituaries2 days ago

Wendy Lee Whitacre-Stout (1966 – 2026)

State News2 days ago

Spanberger’s Energy Plan Keys in on Clean Energy to Meet Growing Demand and VCEA Goals

Obituaries2 days ago

Jean Elizabeth Grubbs Fogle (1939 – 2026)

National News2 days ago

Feds Provide Guidance on New Federal K-12 Scholarship Tax Credit Program

Local News2 days ago

Why Wait Till November? Mid-Term Election Early Voting  Processes in Place Now

National News2 days ago

US Senate Leaves Nation’s Capital in Advance of Midterms With Much Still Undone

Business Growth Series3 days ago

Business Growth Series: If You Don’t Control Your Day, It Controls Your Business

Business3 days ago

The End of a 20-Year Monopoly on the Credit Score

Historically Speaking3 days ago

Voltron and Immigration

State News3 days ago

States OK Solar Panels for Balconies. Safety Guidelines Haven’t Caught Up

National News3 days ago

Trump TV Ads Paid for with $20M in Homeland Security Funds, Dems Find

Local News3 days ago

Blue Ridge Wildlife Center Patient of the Week: Gray Treefrog

Interesting Things to Know3 days ago

Birthday Twins: See Which Famous Face Shares Your Big Day

Community Events3 days ago

Meet-and-Greet Set Sunday for Republican-Endorsed Front Royal Candidates

Obituaries4 days ago

Barbara Ann Mathews Smelser (1943 – 2026)

Obituaries4 days ago

Kathleen Frances Elar (1956 – 2026)