Connect with us

Local News

UPDATE: Lane closings, pattern shift mark prep for a completed South Fork Bridge

Published

on

Get used to it – a trial run of the South Fork Bridge Quadrant Roadway Intersection is now scheduled to begin Monday, Oct. 23; below, shot of QRI lanes from Strasburg Rd. intersection on Oct. 19. Graphics/VDOT website – Photos/Roger Bianchini

UPDATE: Schedule QRI-lane pattern shift is now scheduled to begin Monday, October 23, not Thursday, Oct. 19. That and other planned lane closings to accommodate work may change again. Just be aware that the traffic patterns are changing several times in coming days.

On Tuesday, October 17, Warren County Administrator Doug Stanley alerted county drivers to lane closures and one traffic pattern change proceeding through this and into next week in preparation for the planned full six-lane opening of the South Fork Bridge in and out of Front Royal’s northside later this year.  Four of the five traffic pattern changes involve lane closures – the first of which occurred earlier the day of Stanley’s briefing at the board of supervisors meeting – other planned lane closings are listed below.

The biggest change, originally announced for Thursday, October 19, but now slated to begin Monday, October 23, will shift traffic traveling on and off Route 55 West (Strasburg Road) onto the new Quadrant Roadway Intersection (QRI) lanes – those are the horseshoe-shaped lanes between the bridge and Strasburg Road/Route 55.

It is a traffic shift that will introduce drivers to at least a portion of the permanent pattern shift planned once the new bridge is completed.  That shift is designed to eliminate left turns at the Route 340 and Route 55 intersection just past the north end of the bridge.  Work to facilitate full utilization of the QRI is scheduled for completion in mid-November, about two weeks before the target bridge completion date of December 1.

While it may take some getting used to, VDOT’s vision is a reduction of the high-volume traffic period backups that driver’s are now experiencing.  We still suggest a visit to the VDOT website* to see an animated explanation of the traffic patterns utilizing the quadrant intersection off the bridge’s northwest side.

That said, how the new pattern will be received during low-traffic volume periods remains to be seen – particularly for southbound drivers on Route 340 wishing to turn left into Riverton.  Northbound traffic headed west on Route 55 will simply make their left a few hundred feet south of the 340/55 intersection onto the QRI at the new traffic light on the bridge.

How this traffic pattern will play for southbound drivers wishing to access Riverton, especially during low-traffic volume periods remains to be seen; below, approaching the QRI intersection southbound – if you’re going to Riverton get ready to make a right and another right.

As we understand at this time, the initial QRI pattern shift is for both east and westbound traffic to facilitate roadwork on Route 55 between the quadrant lanes and the intersection with Route 340.

Upon completion the South Fork Bridge will become the longest and widest bridge in VDOT’s Staunton District; a district comprising much of the western part of the state.

In addition to the now planned October 23 QRI pattern shift for traffic in and out of Strasburg Road/Route 55, coming lane closures include (as stated above, be aware dates may change to match work schedule):

  • a single-lane closure north and southbound on Route 340 on Wednesday, October 18 to facilitate milling and the layout for the traffic switch;
  • a southbound, single right-lane closure for Hunt Valley is planned for Friday, Oct. 20;
  • from Monday, Oct. 23 to Friday, Oct. 27, the southbound single right-lane closure for Hunt Valley will be re-established and a northbound single left-lane closure for median construction on Route 340 will be added.

Good luck and happy driving over the South Fork of Virginia’s historic Shenandoah River.

* Footnote: To access the video on the VDOT website (virginiadot.org), click on “Projects”; then “Staunton District”; then “Warren County-Quadrant Roadway Intersection”; then the “South Fork Bridge” link in text under Warren County QRI sub-headline below graphics; click link under “Project Details” and click “Play” on the 2nd of 3 videos.

A closer view of the QRI intersection with the South Fork Bridge from Strasburg Rd.

 

Front Royal, VA
61°
Rain Shower
7:18 am6:40 pm EDT
Feels like: 61°F
Wind: 5mph N
Humidity: 99%
Pressure: 29.89"Hg
UV index: 1
MonTueWed
73°F / 54°F
84°F / 66°F
88°F / 64°F
Scott's Turn57 minutes ago

Walking Malls Don’t Solve Problems

Community Events1 hour ago

Festival of Leaves 2026 Wraps Up a Successful Day in Downtown Front Royal

Kids' Corner7 hours ago

Autumn Delights: Spotlight On Pumpkins!

Local News8 hours ago

Lord Fairfax Health District Receives $5,000 Grant To Support Local EMS Crews

Interesting Things to Know8 hours ago

Why an AI Bubble Could Reach Your Savings

Kids' Corner24 hours ago

The Platypus: A Truly Amazing Animal!

Local News24 hours ago

A Thing of the Heart: Two-Fold Outreach to Children and Award Presentation Brings Hike Kidz to Stone Branch Arts Center

Local News1 day ago

Virginia State Police Seize Drugs Valued at More Than $830,000, Recover 13 Firearms

Opinion1 day ago

Commentary: We Hate Technology. Please Like and Share

Health1 day ago

One Medicare Open Enrollment Decision That Can Be Hard to Undo

Historically Speaking1 day ago

Constitution 101: The Postal Clause

Local News1 day ago

VDOT: Warren County Traffic Alert for October 12 – 16, 2026

Health1 day ago

UVA Poison Expert Warns of Emerging Synthetic Opioids That Fentanyl Tests May Miss

Community Events1 day ago

Pumpkins Will Take to the Skies at Front Royal Warren County Airport Oct. 24

Top Stories2 days ago

Front Royal Remains Under Mandatory Water Conservation As Shenandoah River Flow Drops

Local News2 days ago

Front Royal Women’s Resource Center Opens 2027 Dare to Dream Grant Applications

State News2 days ago

Warner, Mizusawa Outline Competing Approaches to Disability Policy

Local News2 days ago

Fable Greenhouse and Gardens Breathes New Life into Former Horton’s Nursery

Obituaries2 days ago

Louise Virginia “Mom” Messer (1936 – 2026)

Business Growth Series2 days ago

Business Growth Series: Doing Everything Yourself Is Slowing You Down

Interesting Things to Know2 days ago

The Mystery of the Purple Seal

Local News3 days ago

Front Royal Outdoors Founder Don Roberts Named 2026 Protector of the Shenandoah

Crime/Court3 days ago

Front Royal Man Held Without Bond Following Child Sexual Abuse Material Investigation

Local News3 days ago

Performing Arts Center Pointing to 2027 Opening as Local Entertainment, Business, and Educational Partner

Local Government3 days ago

Town Planning Commission Continues to Prepare for the Arrival of Cannabis on the Local Market