NOTICE OF APPLICATION TENDERED FOR FILING WITH THE COMMISSION AND SOLICITING ADDITIONAL STUDY REQUESTS AND ESTABLISHING PROCEDURAL SCHEDULE FOR RELICENSING AND A DEADLINE FOR SUBMISSION OF FINAL AMENDMENTS

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.

  1. Type of Application: Subsequent Minor License
  2. Project No.: 2391-053
  3. Date filed: January 3, 2022
  4. Applicant: PE Hydro Generation, LLC
  5. Name of Project: Warren Hydroelectric Project (P-2391-053)
  6. Location: The Warren Project is located on the Shenandoah River near the Town of Front Royal in Warren County, Virginia.  The project does not occupy any federal land.
  7. Filed Pursuant to: Federal Power Act 16 U.S.C. §§ 791(a) – 825(r)
  8. Applicant Contact: Ms. Jody Smet, Vice President, Regulatory Affairs, PE Hydro Generation, LLC, 7315 Wisconsin Ave., Suite 1100W, Bethesda, MD 20814; Phone at (240) 482-2700 or email at jody.smet@eaglecreekre.com.
  9. FERC Contact: Jody Callihan at (202) 502-8278, or jody.callihan@ferc.gov
  10. Cooperating agencies: Federal, state, local, and tribal agencies with jurisdiction and/or special expertise with respect to environmental issues that wish to cooperate in the preparation of the environmental document should follow the instructions for filing such requests described in item l below.  Cooperating agencies should note the Commission’s policy that agencies that cooperate in the preparation of the environmental document cannot also intervene.  See, 94 FERC ¶ 61,076 (2001).
  11. Pursuant to section 4.32(b)(7) of 18 C.F.R. of the Commission’s regulations, if any resource agency, Indian Tribe, or person believes that an additional scientific study should be conducted in order to form an adequate factual basis for a complete analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request for a study with the Commission not later than 60 days from the date of filing of the application, and serve a copy of the request on the applicant.
  12. Deadline for filing additional study requests and requests for cooperating agency status: March 4, 2022.

The Commission strongly encourages electronic filing.  Please file additional study requests and requests for cooperating agency status using the Commission’s eFiling system at ferc.gov/docs-filing/efiling.  For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).  For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).  In lieu of electronic filing, you may submit a paper copy.  Submissions sent via the U.S. Postal Service must be addressed to:  Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426.  Submissions sent via any other carrier must be addressed to:  Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.  All filings must clearly identify the project name and docket number on the first page:  Warren Project (P-2391-053).

m. The application is not ready for environmental analysis at this time.

n. The Warren Project consists of the following existing facilities: (1) a 15-foot-high, 483-foot-long reinforced concrete dam impounding a small reservoir with a gross storage capacity of 900 acre-feet; (2) an 82-foot-long, 30-foot-wide powerhouse adjacent to the north end of the dam containing three generating units with a total installed capacity of 750 kilowatts; (3) transmission facilities consisting of the 2.4-kilovolt (kV) project generator leads; a 3-phase, 2.4/34.5-kV transformer; and a 34.5-kV, 14,784-foot-long transmission line; and (4) other appurtenances.

The project operates in a run-of-river mode with a minimum flow of 56 cubic feet per second.  The project had an average annual generation of 3,456 megawatt-hours between 2013 and 2017.

o. Copies of the application may be viewed on the Commission’s website at ferc.gov using the “eLibrary” link. Enter the docket number excluding the last three digits in the docket number field to access the document (P-2391).  For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or call toll-free, (866) 208-3676 or (202) 502-8659 (TTY).

You may also register online at ferc.gov/docs-filing/esubscription to be notified via email of new filings and issuances related to this or other pending projects.  For assistance, contact FERC Online Support.

p. Procedural schedule and final amendments: The application will be processed according to the following preliminary schedule.  Revisions to the schedule will be made as appropriate.

    • Issue Deficiency Letter (if necessary)
      March 2022
    • Request Additional Information (if necessary)
      March 2022
    • Issue Acceptance Letter
      May 2022
    • Issue Scoping Document 1 for comments
      June 2022
    • Issue Scoping Document 2 (if necessary)
      August 2022
    • Issue Notice of Ready for Environmental Analysis
      August 2022

Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.

Kimberly D. Bose, Secretary

Front Royal, VA
57°
Rain
7:18 am6:40 pm EDT
Feels like: 57°F
Wind: 6mph N
Humidity: 100%
Pressure: 30.18"Hg
UV index: 0
MonTueWed
73°F / 54°F
84°F / 64°F
86°F / 64°F
Kids' Corner14 hours ago

The Platypus: A Truly Amazing Animal!

Local News14 hours ago

A Thing of the Heart: Two-Fold Outreach to Children and Award Presentation Brings Hike Kidz to Stone Branch Arts Center

Local News15 hours ago

Virginia State Police Seize Drugs Valued at More Than $830,000, Recover 13 Firearms

Opinion18 hours ago

Commentary: We Hate Technology. Please Like and Share

Health19 hours ago

One Medicare Open Enrollment Decision That Can Be Hard to Undo

Historically Speaking19 hours ago

Constitution 101: The Postal Clause

Local News21 hours ago

VDOT: Warren County Traffic Alert for October 12 – 16, 2026

Health22 hours ago

UVA Poison Expert Warns of Emerging Synthetic Opioids That Fentanyl Tests May Miss

Community Events22 hours ago

Pumpkins Will Take to the Skies at Front Royal Warren County Airport Oct. 24

Top Stories2 days ago

Front Royal Remains Under Mandatory Water Conservation As Shenandoah River Flow Drops

Local News2 days ago

Front Royal Women’s Resource Center Opens 2027 Dare to Dream Grant Applications

State News2 days ago

Warner, Mizusawa Outline Competing Approaches to Disability Policy

Local News2 days ago

Fable Greenhouse and Gardens Breathes New Life into Former Horton’s Nursery

Obituaries2 days ago

Louise Virginia “Mom” Messer (1936 – 2026)

Business Growth Series2 days ago

Business Growth Series: Doing Everything Yourself Is Slowing You Down

Interesting Things to Know2 days ago

The Mystery of the Purple Seal

Local News3 days ago

Front Royal Outdoors Founder Don Roberts Named 2026 Protector of the Shenandoah

Crime/Court3 days ago

Front Royal Man Held Without Bond Following Child Sexual Abuse Material Investigation

Local News3 days ago

Performing Arts Center Pointing to 2027 Opening as Local Entertainment, Business, and Educational Partner

Local Government3 days ago

Town Planning Commission Continues to Prepare for the Arrival of Cannabis on the Local Market

Local Government3 days ago

Warren County Schools Improve, But Federal Rules Lower Seven Ratings

State News3 days ago

Spanberger Announces $1.3 Million in Scholarships and Incentives for Nursing Students

Interesting Things to Know3 days ago

The First Long-Distance Phone Call Came With Receipts

Local News3 days ago

Middletown Man Killed In I-81 Crash In Frederick County

Legislative Update3 days ago

Cline Backs Veteran Cancer Screening Effort, Highlights Sixth District Programs